CORRIDOR no. 8
Section: GOSTIVAR - KICEVO
Bridge over the river "VARDAR" (êì 5+150,00) |
location |
Gostivar |
design / construction year |
April 2003 / |
phase |
Preliminary and Detailed Design |
|
Constructive solution |
Bridging of the river "Vardar"
(L=41+42*3+41=208,00 ì) |
- superstructure |
pre-stressed discontinuous construction - four girders in a cross section |
- substructure |
two expanded constructions |
- middle piers |
reinforced concrete sheetsñî êîíñòàíòåí ïðåñåê |
- end piers |
reinforced concrete sheets with parallel wings |
- foundations |
classical reinforced-concrete foundations under sheets |
- constrution technology |
mountable pre-stressed girders, erected with a horisontal crane |
- software |
CUBUS |
|
Working team: |
|
- Designers |
Emil Nikolov, Branko Acevski - civ. eng. |
- Assistants |
V. Arsovski, S. Vasilev, S. Kostadinovska - civ. tech.. |