CORRIDOR no. 8
Section: GOSTIVAR - KICEVO
Bridge over the river "VARDAR" (êì 5+150,00)
location Gostivar
design / construction year April 2003 /
phase Preliminary and Detailed Design
Constructive solution Bridging of the river "Vardar"
(L=41+42*3+41=208,00 ì)
- superstructure pre-stressed discontinuous construction - four girders in a cross section
- substructure two expanded constructions
- middle piers reinforced concrete sheetsñî êîíñòàíòåí ïðåñåê
- end piers reinforced concrete sheets with parallel wings
- foundations classical reinforced-concrete foundations under sheets
- constrution technology mountable pre-stressed girders, erected with a horisontal crane
- software CUBUS
Working team:  
- Designers Emil Nikolov, Branko Acevski - civ. eng.
- Assistants V. Arsovski, S. Vasilev, S. Kostadinovska - civ. tech..