STRUCTURE: Motorway: Deve Bair - Kafasan
  Section: North Bypass of Skopje
  Part: Orizari - Saraj
LOCATION: R. MACEDONIA
INVESTOR: Fund for National and Regional Roads of R. Macedonia
DESIGN YEAR: 2001 - 2003
PHASE: Detailed Design
DESIGNER: Ristevski Riste civ. eng.
LENGTH OF THE ALIGNMENT: 12,30 km
TERRAIN: Mountainous
LEVEL OF TRAFFIC: 15000 vehicles AADT
DESIGN SPEED: 120 km/h
TRAFFIC REGIME Continuous traffic flows
WIDTH 27,50 m
BRIDGES 1500 m'
INVESTMENT VALUE: 57.000.000,00 €