 |
|
|
|
|
STRUCTURE: |
Motorway: Deve Bair - Kafasan |
|
Section: North Bypass of Skopje |
|
Part: Orizari - Saraj |
|
LOCATION: |
R. MACEDONIA |
|
INVESTOR: |
Fund for National and Regional Roads of R. Macedonia |
|
DESIGN YEAR: |
2001 - 2003 |
|
PHASE: |
Detailed Design |
|
DESIGNER: |
Ristevski Riste civ. eng. |
|
LENGTH OF THE ALIGNMENT: |
12,30 km |
|
TERRAIN: |
Mountainous |
|
LEVEL OF TRAFFIC: |
15000 vehicles AADT |
|
DESIGN SPEED: |
120 km/h |
|
TRAFFIC REGIME |
Continuous traffic flows |
|
WIDTH |
27,50 m |
|
BRIDGES |
1500 m' |
|
INVESTMENT VALUE: |
57.000.000,00 € |
|
|
|
|
|
 |
|
|
e-mail: granitpr@unet.com.mk Telephone: ++389 2 30 81 204 / 30 81 190 Fax: ++389 2 30 82 275 |
|
|
 |