STRUCTURE: Motorway: Deve Bair - Kafasan
  Section: Tetovo - Gostivar
LOCATION: R. MACEDONIA
INVESTOR: Fund for National and Regional Roads of R. Macedonia
DESIGN YEAR: 1993
PHASE: Detailed Design for reconstruction
DESIGNER: Cekov Kiro civ. eng.
LENGTH OF THE ALIGNMENT: 20,00 km
TERRAIN: Flat
LEVEL OF TRAFFIC: 15000 vehicles AADT
DESIGN SPEED: 100 km/h
TRAFFIC REGIME Continuous traffic flows
WIDTH 18,00 m
INVESTMENT VALUE: 35.000.000,00 €