STRUCTURE: Railroad: Kumanovo - Deve Bair
Section: Kriva Palanka - Deve Bair
LOCATION: R. MACEDONIA
INVESTOR: Macedonian Railways
DESIGN YEAR: 2002 - 2003
PHASE: Preliminary Design
DESIGNER: Ristevski Riste civ. eng.
LENGTH OF THE ALIGNMENT: 22,00 km
TERRAIN: Mountainous
DESIGN SPEED: 100 km/h
TUNNELS: 8.300,00 m'
BRIDGES: 3.900,00 m'
INVESTMENT VALUE: 140.000.000,00 €