STRUCTURE: Motorway: Deve Bair - Kafasan
  Section: Gostivar - Kicevo
  Part: Gostivar - Bukojcani
LOCATION: R. MACEDONIA
INVESTOR: Fund for National and Regional Roads of R. Macedonia
DESIGN YEAR: 2002
PHASE: Detailed design
DESIGNER: Cvetanovski Zarko civ. eng.
LENGTH OF THE ALIGNMENT: 30,00 km
TERRAIN: Mountainous
LEVEL OF TRAFFIC: 12000 vehicles AADT
DESIGN SPEED: 100 km/h
TRAFFIC REGIME: Continuous traffic flows
WIDTH 25,50 m
TUNNEL 400,00 m'
BRIDGES 3900 m'
EXCAVATION 5.200.000,00 m3
EMBANKMENT 1.600.000,00 m3
INVESTMENT VALUE: 130.000.000,00 €