STRUCTURE: AIRPORT "OHRID”
LOCATION: R. MACEDONIA
INVESTOR: Directorate General of Civil Aviation of R. Macedonia
DESIGN YEAR: 1997
PHASE: Detailed design for reconstructionof the runway with drainage
DESIGNER: Cekov Kiro, civ. eng.
LENGTH OF RUNWAY: 2,00 km
INVESTMENT: 5.000.000,00 €