CORRIDOR no. 8
Section: GOSTIVAR - KICEVO
Underpass “Ì-4” (êì 4+806,00)
location Gostivar
design / construction year September 2003 /
phase Preliminary and Detailed Design
Constructive solution Bridging of the main road Ì-4
(L=24+36+24=84,00 ì)
- superstructure reinforced concrete continuous frame
- substructure single frame construction
- middle piers reinforced concrete sheets
- end piers reinforced concrete sheets with parallel wings
- foundations classical reinforced-concrete foundations under sheets
- constrution technology classical construction with scaffolding
- software CUBUS
Working team:  
- Designers Nace Gicevski, Dimitar Popovski - civ. eng.
- Assistants V. Arsovski, S. Stoilov - civ. tech.